| Assessment Year | 2018 |
|---|---|
| Principal Product | Sausage |
| NAICS | 311613: Rendering and Meat Byproduct Processing |
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
105,000
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Puerto Rico |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $407,782 | 2,459,160 |
kWh
|
$0.17 |
| Electricity Demand | $53,638 | 6,966 |
kW-mo/yr
|
$7.70 |
| Electricity Fees | $5,400 | - |
|
- |
| LPG | $315,000 | 32,060 |
MMBtu
|
$9.83 |
| TOTAL YEARLY COSTS | $781,820 | |||
| RECOMMENDED SAVINGS* | $56,245 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,187 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $9,609 | $40 |
$8,958
53,961
kWh
|
$651
-
kW-mo/yr
|
- | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $7,815 | $1,746 |
$6,982
42,161
kWh
|
$833
-
kW-mo/yr
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $7,784 | $636 |
$6,957
41,909
kWh
|
$827
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,950 | $1,660 |
$4,924
29,661
kWh
|
$1,026
-
kW-mo/yr
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,453 | $2,520 | - | - |
$5,453
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,257 | $10,017 |
$4,699
28,305
kWh
|
$558
-
kW-mo/yr
|
- | |
| 07 | 2.7444: Close holes and openings in building such as broken windows | $4,580 | $460 |
$4,306
25,939
kWh
|
$274
-
kW-mo/yr
|
- | |
| 08 | 2.3212: Optimize plant power factor | $3,469 | $12,235 | - |
$3,469
-
kW-mo/yr
|
- | |
| 09 | 2.4323: Use optimum size and capacity equipment | $2,990 | $4,250 |
$2,628
15,834
kWh
|
$362
-
kW-mo/yr
|
- | |
| 10 | 2.7135: Install occupancy sensors | $2,804 | $1,060 |
$2,804
16,893
kWh
|
- | - | |
| 11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $535 | $40 |
$496
2,987
kWh
|
$39
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $56,245 | $34,664 |
$42,754
257,650
kWh
|
$8,039
-
kW-mo/yr
|
$5,453
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $34,187 | $15,797 |
$26,187
157,746
kWh
|
$2,548
-
kW-mo/yr
|
$5,453
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs