Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product treated water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 13,000,000
ft2
Annual Production 100,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,716,458 141,744,000
kWh
Electricity Demand $2,908,255 533,253
kW-mo/yr
Electricity Fees $628,471 -
TOTAL YEARLY COSTS $9,253,184
RECOMMENDED SAVINGS* $2,239,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,174,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Administrative Changes Savings
01 2.1336: Install equipment to utilize waste fuel $1,663,200 $4,120,000 $1,401,600
35,040,000
kWh
$261,600
-
kW-mo/yr
$(0.0)
-
MMBtu
-
02 2.2696: Use excess cold process fluid for industrial cooling needs $314,391 $1,004,370 $264,941
6,623,524
kWh
$49,450
-
kW-mo/yr
- -
03 2.2628: Utilize a less expensive cooling method $171,697 $338,000 $127,826
3,195,648
kWh
$23,871
-
kW-mo/yr
- $20,000
04 2.7221: Lower temperature during the winter season and vice-versa $32,930 $6,000 $27,752
693,792
kWh
$5,178
-
kW-mo/yr
- -
05 2.8114: Change rate schedules or other changes in utility service $31,753 $112,000 $9,102
227,550
kWh
$22,651
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $25,288 $72,396 $18,414
460,338
kWh
$6,874
-
kW-mo/yr
- -
TOTAL RECOMMENDED $2,239,259 $5,652,766 $1,849,635
46,240,852
kWh
$369,624
-
kW-mo/yr
$(0.0)
-
MMBtu
$20,000
TOTAL IMPLEMENTED $2,174,576 $5,534,766 $1,812,781
45,319,510
kWh
$341,795
-
kW-mo/yr
$(0.0)
-
MMBtu
$20,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs