Assessment Year | 2017 |
---|---|
Principal Product | treated water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
13,000,000
ft2
|
Annual Production | 100,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $5,716,458 | 141,744,000 |
kWh
|
$0.040 |
Electricity Demand | $2,908,255 | 533,253 |
kW-mo/yr
|
$5.45 |
Electricity Fees | $628,471 | - |
|
- |
TOTAL YEARLY COSTS | $9,253,184 | |||
RECOMMENDED SAVINGS* | $2,239,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,174,576 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $1,663,200 | $4,120,000 |
$1,401,600
35,040,000
kWh
|
$261,600
-
kW-mo/yr
|
$(0.0)
-
MMBtu
|
- | |
02 | 2.2696: Use excess cold process fluid for industrial cooling needs | $314,391 | $1,004,370 |
$264,941
6,623,524
kWh
|
$49,450
-
kW-mo/yr
|
- | - | |
03 | 2.2628: Utilize a less expensive cooling method | $171,697 | $338,000 |
$127,826
3,195,648
kWh
|
$23,871
-
kW-mo/yr
|
- | $20,000 | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $32,930 | $6,000 |
$27,752
693,792
kWh
|
$5,178
-
kW-mo/yr
|
- | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $31,753 | $112,000 |
$9,102
227,550
kWh
|
$22,651
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,288 | $72,396 |
$18,414
460,338
kWh
|
$6,874
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $2,239,259 | $5,652,766 |
$1,849,635
46,240,852
kWh
|
$369,624
-
kW-mo/yr
|
$(0.0)
-
MMBtu
|
$20,000 | ||
TOTAL IMPLEMENTED | $2,174,576 | $5,534,766 |
$1,812,781
45,319,510
kWh
|
$341,795
-
kW-mo/yr
|
$(0.0)
-
MMBtu
|
$20,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs