| Assessment Year | 2017 |
|---|---|
| Principal Product | Beer |
| NAICS | 312120: Breweries |
| SIC | 2082: Malt Beverages |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
250,000
ft2
|
| Annual Production | 26,417
Tgal
|
| Production Hrs. Annual | 4,992
hrs
|
| Location (State) | Puerto Rico |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,700,681 | 12,047,520 |
kWh
|
$0.14 |
| Electricity Demand | $276,811 | 29,215 |
kW-mo/yr
|
$9.47 |
| Electricity Fees | $5,400 | - |
|
- |
| TOTAL YEARLY COSTS | $1,982,892 | |||
| RECOMMENDED SAVINGS* | $234,010 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $172,516 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $97,830 | $1,660 |
$64,505
457,480
kWh
|
$33,325
-
kW-mo/yr
|
- | |
| 02 | 2.2628: Utilize a less expensive cooling method | $33,524 | $10,000 |
$28,309
200,770
kWh
|
$2,615
-
kW-mo/yr
|
$2,600 | |
| 03 | 2.7425: Clean or color roof to reduce solar load | $28,589 | $4,520 |
$24,582
174,343
kWh
|
$4,007
-
kW-mo/yr
|
- | |
| 04 | 2.3212: Optimize plant power factor | $27,970 | $22,300 | - |
$27,970
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,644 | $21,418 |
$18,627
132,106
kWh
|
$3,017
-
kW-mo/yr
|
- | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $19,177 | $1,440 |
$16,441
116,603
kWh
|
$2,736
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,449 | $10,720 |
$3,449
24,461
kWh
|
- | - | |
| 08 | 2.7134: Use photocell controls | $938 | $342 |
$938
6,656
kWh
|
- | - | |
| 09 | 2.7135: Install occupancy sensors | $889 | $1,320 |
$889
6,306
kWh
|
- | - | |
| TOTAL RECOMMENDED | $234,010 | $73,720 |
$157,740
1,118,725
kWh
|
$73,670
-
kW-mo/yr
|
$2,600 | ||
| TOTAL IMPLEMENTED | $172,516 | $41,420 |
$129,431
917,955
kWh
|
$43,085
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs