| Assessment Year | 2017 |
|---|---|
| Principal Product | Synthetic Foam |
| NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
| SIC | 3086: Plastics Foam Products |
| Sales Range | $10 M to 50M |
| # of Employees | 101 |
| Plant Area |
219,200
ft2
|
| Annual Production | 190,000
thousand feet
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $92,720 | 1,937,597 |
kWh
|
$0.048 | |
| Electricity Demand | $57,588 | 5,557 |
kW-mo/yr
|
$10.36 | |
| Electricity Fees | $26,662 | - |
|
- | |
| Fuel Oil #1 | $19,777 | 1,170 |
MMBtu
|
$16.90 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,089 | 29,172 |
Tgal
|
$0.072 | |
| TOTAL YEARLY COSTS | $198,836 | ||||
| RECOMMENDED SAVINGS* | $90,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $90,010 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2628: Utilize a less expensive cooling method | $39,159 | $40,000 |
$24,182
503,787
kWh
|
$14,177
-
kW-mo/yr
|
- | $800 | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $12,616 | $120 |
$6,895
143,650
kWh
|
$5,720
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,418 | $29,149 |
$7,066
147,198
kWh
|
$4,352
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,061 | $1,660 |
$6,455
134,490
kWh
|
$3,606
-
kW-mo/yr
|
- | - | |
| 05 | 2.7224: Reduce space conditioning during non-working hours | $7,726 | $120 |
$7,726
160,961
kWh
|
- | - | - | |
| 06 | 2.8226: Increase efficiency of trucks | $5,724 | $5,590 | - | - |
$1,974
-
MMBtu
|
$3,750 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,766 | $3,948 |
$2,766
57,633
kWh
|
- | - | - | |
| 08 | 2.8112: Combine utility meters | $720 | $700 | - | - | - | $720 | |
| 09 | 2.7135: Install occupancy sensors | $540 | $885 |
$540
11,260
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $90,730 | $82,172 |
$55,631
1,158,979
kWh
|
$27,855
-
kW-mo/yr
|
$1,974
-
MMBtu
|
$5,270 | ||
| TOTAL IMPLEMENTED | $90,010 | $81,472 |
$55,631
1,158,979
kWh
|
$27,855
-
kW-mo/yr
|
$1,974
-
MMBtu
|
$4,550 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs