ITAC Assessment: MI0298
ITAC logo
ITAC Assessment: MI0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Electronic Printed Circuits
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 93,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,872 2,903,040
kWh
Electricity Demand $87,844 6,906
kW-mo/yr
Electricity Fees $23,096 -
TOTAL YEARLY COSTS $283,812
RECOMMENDED SAVINGS* $118,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,076

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $34,838 $36,314 $22,016
366,941
kWh
$12,822
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,018 $53,398 $9,112
151,865
kWh
$9,906
-
kW-mo/yr
03 2.7293: Install dry sprinkler system or other method to reduce heating requirements $16,796 $40,060 $13,005
216,757
kWh
$3,791
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $15,528 $40 $12,026
200,430
kWh
$3,502
-
kW-mo/yr
05 2.2437: Recover waste heat from equipment $9,324 $3,985 $4,465
74,411
kWh
$4,859
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,991 $8,588 $4,310
71,839
kWh
$4,681
-
kW-mo/yr
07 2.4239: Eliminate or reduce compressed air usage $6,682 $5,600 $3,171
52,846
kWh
$3,511
-
kW-mo/yr
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,220 $1,660 $1,541
25,680
kWh
$1,679
-
kW-mo/yr
09 2.7134: Use photocell controls $2,087 $2,520 $2,087
34,782
kWh
-
10 2.7221: Lower temperature during the winter season and vice-versa $1,219 $40 $944
15,726
kWh
$275
-
kW-mo/yr
11 2.7111: Reduce illumination to minimum necessary levels $664 $760 $318
5,298
kWh
$346
-
kW-mo/yr
12 2.7135: Install occupancy sensors $552 $177 $552
9,208
kWh
-
TOTAL RECOMMENDED $118,919 $153,142 $73,547
1,225,783
kWh
$45,372
-
kW-mo/yr
TOTAL IMPLEMENTED $57,076 $91,372 $32,669
544,486
kWh
$24,407
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs