ITAC Assessment: MI0295
ITAC logo
ITAC Assessment: MI0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Building Siding
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 120,000
ft2
Annual Production 16,250,000
thousand feet
Production Hrs. Annual 5,880
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,468 5,073,200
kWh
Electricity Demand $164,813 13,723
kW-mo/yr
Electricity Fees $57,087 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,797 $59,670 $18,401
383,347
kWh
$9,396
-
kW-mo/yr
- -
02 2.2628: Utilize a less expensive cooling method $26,678 $80,000 $10,801
225,019
kWh
$5,477
-
kW-mo/yr
$10,400 -
03 2.4239: Eliminate or reduce compressed air usage $17,275 $4,471 $11,438
238,282
kWh
$5,837
-
kW-mo/yr
- -
04 2.7134: Use photocell controls $11,307 $10,380 $7,485
155,938
kWh
$3,822
-
kW-mo/yr
- -
05 2.7221: Lower temperature during the winter season and vice-versa $7,874 $40 $7,553
157,356
kWh
$321
-
kW-mo/yr
- -
06 2.7293: Install dry sprinkler system or other method to reduce heating requirements $7,334 $4,411 $4,416
92,007
kWh
$2,918
-
kW-mo/yr
- -
07 2.8123: Pay utility bills on time $4,723 - - - - $4,723
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,957 $1,660 $838
17,462
kWh
$2,119
-
kW-mo/yr
- -
09 2.7111: Reduce illumination to minimum necessary levels $2,084 $320 $1,384
28,824
kWh
$700
-
kW-mo/yr
- -
10 2.7135: Install occupancy sensors $1,284 $683 $1,284
26,757
kWh
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $448 $640 $448
9,330
kWh
- - -
TOTAL RECOMMENDED $109,761 $162,275 $64,048
1,334,322
kWh
$30,590
-
kW-mo/yr
$10,400 $4,723
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs