ITAC Assessment: MI0286
ITAC logo
ITAC Assessment: MI0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product High Volume Hydraulic Cartridges
NAICS 332919: Other Metal Valve and Pipe Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $50
M
to 100
M
# of Employees 267
Plant Area 70,000
ft2
Annual Production 1,560,000
pieces
Production Hrs. Annual 8,008
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,894 6,196,745
kWh
Electricity Demand $153,550 12,347
kW-mo/yr
Electricity Fees $23,197 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $19,094 $29,862 $19,094
415,068
kWh
-
02 2.7292: Lower ceiling to reduce conditioned space $14,710 $100,350 $14,710
319,780
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $12,602 $80 $12,602
273,995
kWh
-
04 2.2437: Recover waste heat from equipment $7,447 $6,660 $5,296
115,131
kWh
$2,151
-
kW-mo/yr
05 2.4323: Use optimum size and capacity equipment $5,778 $4,691 $2,644
57,487
kWh
$3,134
-
kW-mo/yr
06 2.7496: Install partitions to reduce size of conditioned space $3,819 $11,872 $3,819
83,017
kWh
-
07 2.4239: Eliminate or reduce compressed air usage $3,433 $5,370 $1,381
30,025
kWh
$2,052
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,382 $40 $636
13,823
kWh
$746
-
kW-mo/yr
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $920 $1,670 $472
10,267
kWh
$448
-
kW-mo/yr
TOTAL RECOMMENDED $69,185 $160,595 $60,654
1,318,593
kWh
$8,531
-
kW-mo/yr
TOTAL IMPLEMENTED $33,804 $130,212 $33,804
734,848
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs