| Assessment Year | 2015 |
|---|---|
| Principal Product | Low Volume Hydraulic Cartridges |
| NAICS | 332919: Other Metal Valve and Pipe Fitting Manufacturing |
| SIC | 3492: Fluid Power Valves and Hose Fittings |
| Sales Range | $50 M to 100M |
| # of Employees | 267 |
| Plant Area |
55,000
ft2
|
| Annual Production | 2,080,000
pieces
|
| Production Hrs. Annual | 8,008
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $257,069 | 5,320,000 |
kWh
|
$0.048 |
| Electricity Demand | $146,464 | 11,813 |
kW-mo/yr
|
$12.40 |
| Electricity Fees | $40,765 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $156,782 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $147,179 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2628: Utilize a less expensive cooling method | $77,529 | $180,000 |
$39,994
833,215
kWh
|
$14,135
-
kW-mo/yr
|
$23,400 | |
| 02 | 2.7292: Lower ceiling to reduce conditioned space | $28,449 | $55,650 |
$20,997
437,438
kWh
|
$7,452
-
kW-mo/yr
|
- | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $28,415 | $160 |
$20,976
436,995
kWh
|
$7,439
-
kW-mo/yr
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $11,198 | $6,520 |
$4,629
96,430
kWh
|
$6,569
-
kW-mo/yr
|
- | |
| 05 | 2.4323: Use optimum size and capacity equipment | $5,094 | $4,691 |
$4,201
87,516
kWh
|
$893
-
kW-mo/yr
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,302 | $40 |
$3,062
63,794
kWh
|
$1,240
-
kW-mo/yr
|
- | |
| 07 | 2.7425: Clean or color roof to reduce solar load | $1,588 | $2,527 |
$1,172
24,411
kWh
|
$416
-
kW-mo/yr
|
- | |
| 08 | 2.7135: Install occupancy sensors | $207 | $105 |
$207
4,310
kWh
|
- | - | |
| TOTAL RECOMMENDED | $156,782 | $249,693 |
$95,238
1,984,109
kWh
|
$38,144
-
kW-mo/yr
|
$23,400 | ||
| TOTAL IMPLEMENTED | $147,179 | $244,857 |
$87,768
1,828,489
kWh
|
$36,011
-
kW-mo/yr
|
$23,400 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs