| Assessment Year | 2002 |
|---|---|
| Principal Product | Kitchen and bathroom wood cabinets |
| NAICS |
n/a
|
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $10 M to 50M |
| # of Employees | 260 |
| Plant Area |
135,000
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 6,006
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,227 | 1,682,070 |
kWh
|
$0.063 |
| Electricity Demand | $20,171 | 4,394 |
kW-mo/yr
|
$4.59 |
| Electricity Fees | $15,349 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $175,254 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $164,605 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,932 | $220 |
$20,202
285,746
kWh
|
$3,730
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,163 | $3,020 |
$2,757
38,632
kWh
|
$406
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7135: Install occupancy sensors | $276 | $375 |
$227
3,183
kWh
|
$49
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $6,114 | $540 |
$6,114
86,486
kWh
|
- | - | - | - | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $633 | - |
$481
6,734
kWh
|
$152
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7232: Replace existing hvac unit with high efficiency model | $1,096 | $2,100 |
$955
13,371
kWh
|
$141
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $1,800 | $154 | - | - |
$1,800
-
lb
|
- | - | |
| 08 | 4.111: Add equipment/ operators to reduce production bottleneck | $29,052 | $6,600 | - | - | - | $29,052 | - | |
| 09 | 4.513: Re-arrange equipment layout to reduce labor costs | $109,188 | $7,050 | - | - | - | - | $109,188 | |
| TOTAL RECOMMENDED | $175,254 | $20,059 |
$30,736
434,152
kWh
|
$4,478
-
kW-mo/yr
|
$1,800
-
lb
|
$29,052 | $109,188 | ||
| TOTAL IMPLEMENTED | $164,605 | $14,024 |
$20,683
292,480
kWh
|
$3,882
-
kW-mo/yr
|
$1,800
-
lb
|
$29,052 | $109,188 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs