ITAC Assessment: MI0274
ITAC logo
ITAC Assessment: MI0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Muffins
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 80,000
ft2
Annual Production 45
ton
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,685 2,609,520
kWh
Electricity Demand $65,640 5,274
kW-mo/yr
Electricity Fees $40,055 -
Natural Gas $61,054 15,062
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $34,151 $1,660 $16,707
327,598
kWh
$17,444
-
kW-mo/yr
- -
02 2.7221: Lower temperature during the winter season and vice-versa $14,336 $140 $14,336
281,099
kWh
- - -
03 2.1331: Burn a less expensive grade of fuel $10,584 $14,880 - - - $10,584
04 2.4323: Use optimum size and capacity equipment $10,327 $4,691 $8,224
161,258
kWh
$2,103
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $8,833 $11,640 $6,633
130,052
kWh
$2,200
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,565 $40 $3,320
65,103
kWh
$1,245
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,430 $1,710 $3,430
67,251
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $3,100 $639 $2,322
45,582
kWh
$778
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,582 $6,871 $1,935
37,942
kWh
$647
-
kW-mo/yr
- -
10 3.4116: Meter recycled water (to reduce sewer charges) $1,145 $780 - - - $1,145
11 2.2515: Use optimum thickness insulation $626 $360 - - $626
-
MMBtu
-
12 2.7111: Reduce illumination to minimum necessary levels $457 $160 $342
6,709
kWh
$115
-
kW-mo/yr
- -
13 2.2511: Insulate bare equipment $320 $310 - - $320
-
MMBtu
-
14 2.7132: Install timers on light switches in little used areas $253 $320 $253
4,964
kWh
- - -
TOTAL RECOMMENDED $94,709 $44,201 $57,502
1,127,558
kWh
$24,532
-
kW-mo/yr
$946
-
MMBtu
$11,729
TOTAL IMPLEMENTED $83,805 $29,011 $57,502
1,127,558
kWh
$24,532
-
kW-mo/yr
$626
-
MMBtu
$1,145
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs