Assessment Year | 2015 |
---|---|
Principal Product | Muffins |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
80,000
ft2
|
Annual Production | 45
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $133,685 | 2,609,520 |
kWh
|
$0.051 |
Electricity Demand | $65,640 | 5,274 |
kW-mo/yr
|
$12.45 |
Electricity Fees | $40,055 | - |
|
- |
Natural Gas | $61,054 | 15,062 |
MMBtu
|
$4.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,709 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,805 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $34,151 | $1,660 |
$16,707
327,598
kWh
|
$17,444
-
kW-mo/yr
|
- | - | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $14,336 | $140 |
$14,336
281,099
kWh
|
- | - | - | |
03 | 2.1331: Burn a less expensive grade of fuel | $10,584 | $14,880 | - | - | - | $10,584 | |
04 | 2.4323: Use optimum size and capacity equipment | $10,327 | $4,691 |
$8,224
161,258
kWh
|
$2,103
-
kW-mo/yr
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $8,833 | $11,640 |
$6,633
130,052
kWh
|
$2,200
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,565 | $40 |
$3,320
65,103
kWh
|
$1,245
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,430 | $1,710 |
$3,430
67,251
kWh
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $3,100 | $639 |
$2,322
45,582
kWh
|
$778
-
kW-mo/yr
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,582 | $6,871 |
$1,935
37,942
kWh
|
$647
-
kW-mo/yr
|
- | - | |
10 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,145 | $780 | - | - | - | $1,145 | |
11 | 2.2515: Use optimum thickness insulation | $626 | $360 | - | - |
$626
-
MMBtu
|
- | |
12 | 2.7111: Reduce illumination to minimum necessary levels | $457 | $160 |
$342
6,709
kWh
|
$115
-
kW-mo/yr
|
- | - | |
13 | 2.2511: Insulate bare equipment | $320 | $310 | - | - |
$320
-
MMBtu
|
- | |
14 | 2.7132: Install timers on light switches in little used areas | $253 | $320 |
$253
4,964
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $94,709 | $44,201 |
$57,502
1,127,558
kWh
|
$24,532
-
kW-mo/yr
|
$946
-
MMBtu
|
$11,729 | ||
TOTAL IMPLEMENTED | $83,805 | $29,011 |
$57,502
1,127,558
kWh
|
$24,532
-
kW-mo/yr
|
$626
-
MMBtu
|
$1,145 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs