ITAC Assessment: MI0260
ITAC logo
ITAC Assessment: MI0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $100
M
to 500
M
# of Employees 420
Plant Area 500,000
ft2
Annual Production 1,200
units
Production Hrs. Annual 3,276
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,004 2,807,620
kWh
Electricity Demand $72,941 13,398
kW-mo/yr
Electricity Fees $14,647 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,182

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,276 $162,540 $17,337
247,665
kWh
$4,939
-
kW-mo/yr
02 2.7145: Install skylights $21,450 $52,105 $16,511
235,872
kWh
$4,939
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $13,922 $6,600 $10,835
154,792
kWh
$3,087
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,020 $1,660 $6,951
99,927
kWh
$2,069
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,032 $6,480 $6,622
94,608
kWh
$1,410
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,062 $80 $3,442
49,168
kWh
$620
-
kW-mo/yr
07 2.4239: Eliminate or reduce compressed air usage $3,236 $5,000 $2,584
36,484
kWh
$652
-
kW-mo/yr
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,278 $1,660 $1,390
19,860
kWh
$888
-
kW-mo/yr
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,716 $1,660 $1,096
15,661
kWh
$620
-
kW-mo/yr
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,326 $80 $966
13,798
kWh
$360
-
kW-mo/yr
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $789 $1,660 $605
8,639
kWh
$184
-
kW-mo/yr
12 2.4231: Reduce the pressure of compressed air to the minimum required $649 $80 $485
6,935
kWh
$164
-
kW-mo/yr
13 2.4231: Reduce the pressure of compressed air to the minimum required $610 $80 $420
6,001
kWh
$190
-
kW-mo/yr
14 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $525 $1,660 $407
5,809
kWh
$118
-
kW-mo/yr
15 2.4231: Reduce the pressure of compressed air to the minimum required $521 $80 $344
4,915
kWh
$177
-
kW-mo/yr
TOTAL RECOMMENDED $90,412 $241,425 $69,995
1,000,134
kWh
$20,417
-
kW-mo/yr
TOTAL IMPLEMENTED $46,182 $65,805 $35,201
503,069
kWh
$10,981
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs