Assessment Year 2014
Principal Product Medical Equipment
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 30,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,665 1,500,298
kWh
Electricity Demand $48,429 4,634
kW-mo/yr
Electricity Fees $6,507 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $15,289 $80 - $15,289
-
kW-mo/yr
02 2.7425: Clean or color roof to reduce solar load $9,010 $8,479 $4,516
88,552
kWh
$4,494
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $8,650 $3,100 $6,016
117,954
kWh
$2,634
-
kW-mo/yr
04 2.7111: Reduce illumination to minimum necessary levels $7,728 $760 $3,872
75,919
kWh
$3,856
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,251 $9,720 $3,412
64,386
kWh
$1,839
-
kW-mo/yr
06 2.7496: Install partitions to reduce size of conditioned space $3,604 $8,400 $1,806
35,420
kWh
$1,798
-
kW-mo/yr
07 2.7221: Lower temperature during the winter season and vice-versa $3,090 $1,040 $2,149
42,128
kWh
$941
-
kW-mo/yr
08 2.7135: Install occupancy sensors $1,545 $622 $772
15,140
kWh
$773
-
kW-mo/yr
09 2.7496: Install partitions to reduce size of conditioned space $820 $80 $413
8,096
kWh
$407
-
kW-mo/yr
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $629 $1,660 $115
2,247
kWh
$514
-
kW-mo/yr
11 2.4231: Reduce the pressure of compressed air to the minimum required $183 $80 $83
1,662
kWh
$100
-
kW-mo/yr
TOTAL RECOMMENDED $55,799 $34,021 $23,154
451,504
kWh
$32,645
-
kW-mo/yr
TOTAL IMPLEMENTED $30,835 $15,741 $17,523
343,602
kWh
$13,312
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs