Assessment Year | 2013 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $50 M to 100M |
# of Employees | 65 |
Plant Area |
500,000
ft2
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 2,964
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,971 | 1,007,520 |
kWh
|
$0.053 |
Electricity Demand | $45,120 | 4,494 |
kW-mo/yr
|
$10.04 |
Electricity Fees | $16,335 | - |
|
- |
Fuel Oil #2 | $1,286,857 | 45,362 |
MMBtu
|
$28.37 |
Fuel Oil #6 | $988,581 | 86,735 |
MMBtu
|
$11.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $771,409 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,330 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1332: Convert combustion equipment to burn natural gas | $630,378 | $1,000,000 | - | - |
$630,378
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $118,483 | $20,790 | - | - | - |
$118,483
-
MMBtu
|
|
03 | 2.8226: Increase efficiency of trucks | $7,110 | $5,800 | - | - |
$7,110
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,027 | $8,010 |
$3,220
64,414
kWh
|
$1,807
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,525 | $1,660 |
$2,296
45,924
kWh
|
$2,229
-
kW-mo/yr
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,908 | $2,520 | - | - |
$2,908
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,108 | $80 |
$1,032
20,649
kWh
|
$1,076
-
kW-mo/yr
|
- | - | |
08 | 2.6127: Maintain air filters by cleaning or replacement | $870 | $347 |
$478
9,563
kWh
|
$392
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $771,409 | $1,039,207 |
$7,026
140,550
kWh
|
$5,504
-
kW-mo/yr
|
$640,396
-
MMBtu
|
$118,483
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,330 | $12,537 |
$5,994
119,901
kWh
|
$4,428
-
kW-mo/yr
|
$2,908
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs