| Assessment Year | 2012 |
|---|---|
| Principal Product | Car wash equipment |
| NAICS | 333318: Other Commercial and Service Industry Machinery Manufacturing |
| SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
135,000
ft2
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 3,146
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $74,739 | 1,307,280 |
kWh
|
$0.057 |
| Electricity Demand | $39,736 | 4,217 |
kW-mo/yr
|
$9.42 |
| Electricity Fees | $19,090 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,794 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,770 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $18,962 | $4,500 |
$13,958
193,856
kWh
|
$5,004
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,605 | $39,990 |
$12,429
172,621
kWh
|
$6,176
-
kW-mo/yr
|
|
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $3,727 | $1,300 |
$2,483
34,491
kWh
|
$1,244
-
kW-mo/yr
|
|
| 04 | 2.6218: Turn off equipment when not in use | $1,412 | $900 |
$941
13,073
kWh
|
$471
-
kW-mo/yr
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,064 | $1,320 |
$747
10,378
kWh
|
$317
-
kW-mo/yr
|
|
| 06 | 2.4239: Eliminate or reduce compressed air usage | $567 | $610 |
$379
5,265
kWh
|
$188
-
kW-mo/yr
|
|
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $457 | $50 |
$296
4,109
kWh
|
$161
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $44,794 | $48,670 |
$31,233
433,793
kWh
|
$13,561
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $43,770 | $48,010 |
$30,558
424,419
kWh
|
$13,212
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs