ITAC Assessment: MI0215
ITAC logo
ITAC Assessment: MI0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Power Connector
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 20,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,602 1,232,240
kWh
Electricity Demand $35,882 3,823
kW-mo/yr
Electricity Fees $27,505 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $15,517 $8,000 $11,706
148,174
kWh
$3,811
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,090 $1,320 $6,132
77,618
kWh
$1,958
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,007 $21,070 $4,750
60,132
kWh
$3,257
-
kW-mo/yr
04 2.7496: Install partitions to reduce size of conditioned space $6,640 $12,200 $3,943
49,907
kWh
$2,697
-
kW-mo/yr
05 2.7221: Lower temperature during the winter season and vice-versa $5,815 $1,300 $3,450
43,670
kWh
$2,365
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,514 $50 $2,626
33,243
kWh
$888
-
kW-mo/yr
07 2.4323: Use optimum size and capacity equipment $625 $4,571 $475
6,011
kWh
$150
-
kW-mo/yr
TOTAL RECOMMENDED $48,208 $48,511 $33,082
418,755
kWh
$15,126
-
kW-mo/yr
TOTAL IMPLEMENTED $21,332 $9,300 $15,156
191,844
kWh
$6,176
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs