| Assessment Year | 2011 |
|---|---|
| Principal Product | Drill Bits |
| NAICS | 333517: Machine Tool Manufacturing |
| SIC | 3541: Machine Tools, Metal Cutting Types |
| Sales Range | $5 M to 10M |
| # of Employees | 95 |
| Plant Area |
10,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $47,168 | 819,164 |
kWh
|
$0.058 |
| Electricity Demand | $18,313 | 2,017 |
kW-mo/yr
|
$9.08 |
| Electricity Fees | $6,012 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,350 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,817 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7496: Install partitions to reduce size of conditioned space | $5,935 | $14,200 |
$4,230
65,079
kWh
|
$1,705
-
kW-mo/yr
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $4,640 | $1,300 |
$3,305
50,843
kWh
|
$1,335
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,899 | $4,000 |
$2,073
31,886
kWh
|
$826
-
kW-mo/yr
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,184 | $1,320 |
$1,558
23,975
kWh
|
$626
-
kW-mo/yr
|
|
| 05 | 2.7233: Use properly designed and sized hvac equipment | $1,255 | $350 |
$892
13,728
kWh
|
$363
-
kW-mo/yr
|
|
| 06 | 2.4239: Eliminate or reduce compressed air usage | $1,430 | $1,860 |
$1,021
15,700
kWh
|
$409
-
kW-mo/yr
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,260 | $2,830 |
$897
13,790
kWh
|
$363
-
kW-mo/yr
|
|
| 08 | 2.6218: Turn off equipment when not in use | $747 | $900 |
$532
8,192
kWh
|
$215
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $20,350 | $26,760 |
$14,508
223,193
kWh
|
$5,842
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $6,817 | $4,060 |
$4,858
74,735
kWh
|
$1,959
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs