ITAC Assessment: AM0751
ITAC logo
ITAC Assessment: AM0751
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Rebar fabrication and extruded cable
NAICS 332114: Custom Roll Forming
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 105,000
ft2
Annual Production 135,000,000
lb
Production Hrs. Annual 5,985
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,922 1,740,768
kWh
Electricity Demand $35,772 6,002
kW-mo/yr
Electricity Fees $9,466 -
Natural Gas $401 26
MMBtu
TOTAL YEARLY COSTS $156,561
RECOMMENDED SAVINGS* $69,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $15,720 $6,000 - - - $15,720
-
lb
-
02 2.3212: Optimize plant power factor $12,430 $20,750 - $12,430
-
kW-mo/yr
- - -
03 2.8121: Apply for tax-free status for energy purchases $27,160 $10,000 - - $6,790 - $20,370
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,355 $1,000 $4,020
62,800
kWh
$1,335
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $4,980 $500 $3,740
58,380
kWh
$1,240
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $2,005 $3,520 - $2,005
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,310 $7 $980
15,300
kWh
$330
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $650 $470 $650
10,100
kWh
- - - -
TOTAL RECOMMENDED $69,610 $42,247 $9,390
146,580
kWh
$17,340
-
kW-mo/yr
$6,790 $15,720
-
lb
$20,370
TOTAL IMPLEMENTED $26,730 $26,247 $9,390
146,580
kWh
$17,340
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs