Assessment Year | 2022 |
---|---|
Principal Product | engineered polymers, gaskets |
NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
204,000
ft2
|
Annual Production | 5,000,000,000
pieces
|
Production Hrs. Annual | 8,472
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $443,358 | 9,574,000 |
kWh
|
$0.046 |
Electricity Demand | $184,037 | 20,521 |
kW-mo/yr
|
$8.97 |
Electricity Fees | $14,634 | - |
|
- |
Natural Gas | $464,306 | 77,897 |
MMBtu
|
$5.96 |
TOTAL YEARLY COSTS | $1,106,335 | |||
RECOMMENDED SAVINGS* | $139,599 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $131,299 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $80,175 | $8,170 | - | - |
$80,175
-
MMBtu
|
- | - | |
02 | 2.3212: Optimize plant power factor | $27,516 | $41,926 | - |
$27,516
-
kW-mo/yr
|
- | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $18,325 | $6,300 | - | - |
$18,325
-
MMBtu
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,300 | $9,000 |
$8,300
180,400
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,080 | $16,563 |
$3,788
82,355
kWh
|
$1,044
-
kW-mo/yr
|
- | - | $(-752.0) | |
06 | 2.1241: Reduce excessive boiler blowdown | $1,203 | $4,750 | - | - |
$1,010
-
MMBtu
|
$193
-
Tgal
|
- | |
TOTAL RECOMMENDED | $139,599 | $86,709 |
$12,088
262,755
kWh
|
$28,560
-
kW-mo/yr
|
$99,510
-
MMBtu
|
$193
-
Tgal
|
$(-752.0) | ||
TOTAL IMPLEMENTED | $131,299 | $77,709 |
$3,788
82,355
kWh
|
$28,560
-
kW-mo/yr
|
$99,510
-
MMBtu
|
$193
-
Tgal
|
$(-752.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs