ITAC Assessment: MI0212
ITAC logo
ITAC Assessment: MI0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Marketing Media
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 75,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,672 1,814,800
kWh
Electricity Demand $59,127 5,639
kW-mo/yr
Electricity Fees $23,240 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2628: Utilize a less expensive cooling method $22,567 $75,000 $17,524
250,337
kWh
$5,043
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,602 $9,200 $5,474
78,205
kWh
$1,128
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,091 $2,600 $4,088
68,138
kWh
$2,003
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,896 $6,665 $2,746
39,232
kWh
$1,150
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,074 $4,800 $1,382
19,749
kWh
$692
-
kW-mo/yr
06 2.6218: Turn off equipment when not in use $1,802 $1,300 $1,270
18,148
kWh
$532
-
kW-mo/yr
07 2.6218: Turn off equipment when not in use $984 $1,993 $693
9,912
kWh
$291
-
kW-mo/yr
08 2.6218: Turn off equipment when not in use $501 $50 $340
4,861
kWh
$161
-
kW-mo/yr
TOTAL RECOMMENDED $44,517 $101,608 $33,517
488,582
kWh
$11,000
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs