Assessment Year | 2011 |
---|---|
Principal Product | Medical Instruments |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
364,000
ft2
|
Annual Production | 250,000
pieces
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,322,200 | 13,222,000 |
kWh
|
$0.10 |
Electricity Demand | $216,046 | 21,605 |
kW-mo/yr
|
$10.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $320,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $79,827 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $123,852 | $137,314 |
$106,452
1,064,516
kWh
|
$17,400
-
kW-mo/yr
|
|
02 | 2.2628: Utilize a less expensive cooling method | $76,417 | $150,000 |
$65,687
656,866
kWh
|
$10,730
-
kW-mo/yr
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $61,926 | $2,550 |
$53,226
532,258
kWh
|
$8,700
-
kW-mo/yr
|
|
04 | 2.2136: Install / repair insulation on steam lines | $33,207 | $8,474 |
$28,547
285,466
kWh
|
$4,660
-
kW-mo/yr
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,901 | $1,320 |
$15,391
153,906
kWh
|
$2,510
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,650 | $9,200 |
$6,574
65,744
kWh
|
$1,076
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $320,953 | $308,858 |
$275,877
2,758,756
kWh
|
$45,076
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $79,827 | $3,870 |
$68,617
686,164
kWh
|
$11,210
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs