ITAC Assessment: MI0207
ITAC logo
ITAC Assessment: MI0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Medical Instruments
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 364,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,322,200 13,222,000
kWh
Electricity Demand $216,046 21,605
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $320,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,827

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $123,852 $137,314 $106,452
1,064,516
kWh
$17,400
-
kW-mo/yr
02 2.2628: Utilize a less expensive cooling method $76,417 $150,000 $65,687
656,866
kWh
$10,730
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $61,926 $2,550 $53,226
532,258
kWh
$8,700
-
kW-mo/yr
04 2.2136: Install / repair insulation on steam lines $33,207 $8,474 $28,547
285,466
kWh
$4,660
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,901 $1,320 $15,391
153,906
kWh
$2,510
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,650 $9,200 $6,574
65,744
kWh
$1,076
-
kW-mo/yr
TOTAL RECOMMENDED $320,953 $308,858 $275,877
2,758,756
kWh
$45,076
-
kW-mo/yr
TOTAL IMPLEMENTED $79,827 $3,870 $68,617
686,164
kWh
$11,210
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs