ITAC Assessment: MI0202
ITAC logo
ITAC Assessment: MI0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Knit Beachwear
NAICS 315190: Other Apparel Knitting Mills
SIC 2253: Knit Outerwear Mills
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 275,000
ft2
Annual Production 85,000,000
pieces
Production Hrs. Annual 2,397
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,212 2,092,122
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,606 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,124

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.6218: Turn off equipment when not in use $24,647 $9,000 $16,427
164,271
kWh
$8,220
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,531 $62,700 $8,351
83,511
kWh
$4,180
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,679 $1,320 $2,577
25,771
kWh
$1,102
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $2,481 $6,700 $1,651
16,511
kWh
$830
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $2,001 $1,980 $1,331
13,307
kWh
- $670
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,267 $50 $819
8,187
kWh
$448
-
kW-mo/yr
-
TOTAL RECOMMENDED $46,606 $81,750 $31,156
311,558
kWh
$14,780
-
kW-mo/yr
$670
TOTAL IMPLEMENTED $42,124 $73,070 $28,174
281,740
kWh
$13,950
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs