| Assessment Year | 2010 |
|---|---|
| Principal Product | Fruit Juice |
| NAICS | 311421: Fruit and Vegetable Canning |
| SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
| Sales Range | $50 M to 100M |
| # of Employees | 160 |
| Plant Area |
250,000
ft2
|
| Annual Production | 29,070,000
pieces
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,556,824 | 15,568,240 |
kWh
|
$0.10 |
| Natural Gas | $617,414 | 44,101 |
MMBtu
|
$14.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $359,936 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $194,110 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $159,261 | $64,000 | - | - |
$159,261
-
MMBtu
|
|
| 02 | 2.2447: Heat water with exhaust heat | $100,762 | $23,000 |
$11,360
113,641
kWh
|
$2,230
-
kW-mo/yr
|
$87,172
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58,162 | $63,083 |
$57,231
572,311
kWh
|
$931
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,000 | $1,210 |
$14,169
141,688
kWh
|
$3,831
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,004 | $40 |
$12,717
127,167
kWh
|
$2,287
-
kW-mo/yr
|
- | |
| 06 | 2.4323: Use optimum size and capacity equipment | $6,565 | $4,531 |
$5,790
57,897
kWh
|
$775
-
kW-mo/yr
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,182 | $1,750 | - | - |
$2,182
-
MMBtu
|
|
| TOTAL RECOMMENDED | $359,936 | $157,614 |
$101,267
1,012,704
kWh
|
$10,054
-
kW-mo/yr
|
$248,615
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $194,110 | $89,083 |
$95,477
954,807
kWh
|
$9,279
-
kW-mo/yr
|
$89,354
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs