ITAC Assessment: MI0191
ITAC logo
ITAC Assessment: MI0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product soft drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area 150,000
ft2
Annual Production 67,000
Tgal
Production Hrs. Annual 8,568
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,936,793 19,340,388
kWh
Natural Gas $492,099 43,912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,029,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,255

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2447: Heat water with exhaust heat $697,331 $128,000 $40,928
454,601
kWh
$5,281
-
kW-mo/yr
$651,122
-
MMBtu
02 2.2696: Use excess cold process fluid for industrial cooling needs $228,145 $400,000 $103,073
1,145,256
kWh
$13,297
-
kW-mo/yr
$111,775
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $48,196 $1,500 $42,691
474,346
kWh
$5,505
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $47,683 $1,210 $42,236
469,289
kWh
$5,447
-
kW-mo/yr
-
05 2.4323: Use optimum size and capacity equipment $8,572 $5,300 $7,594
85,374
kWh
$978
-
kW-mo/yr
-
TOTAL RECOMMENDED $1,029,927 $536,010 $236,522
2,628,866
kWh
$30,508
-
kW-mo/yr
$762,897
-
MMBtu
TOTAL IMPLEMENTED $56,255 $6,510 $49,830
554,663
kWh
$6,425
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs