| Assessment Year | 2009 |
|---|---|
| Principal Product | Blood testing equipment |
| NAICS | 334510: Electromedical and Electrotherapeutic Apparatus Manufacturing |
| SIC | 3845: Electromedical and Electrotherapeutic Apparatus |
| Sales Range | $50 M to 100M |
| # of Employees | 475 |
| Plant Area |
500,000
ft2
|
| Annual Production | 125,000
units
|
| Production Hrs. Annual | 6,732
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,424,057 | 16,453,831 |
kWh
|
$0.087 |
| Electricity Demand | $328,603 | 59,073 |
kW-mo/yr
|
$5.56 |
| Electricity Fees | $289,288 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $431,504 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $327,855 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2628: Utilize a less expensive cooling method | $160,282 | - |
$142,612
1,782,634
kWh
|
$17,670
-
kW-mo/yr
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $110,625 | $4,000 |
$98,432
1,230,403
kWh
|
$12,193
-
kW-mo/yr
|
|
| 03 | 2.2628: Utilize a less expensive cooling method | $76,266 | $28,000 |
$67,859
848,232
kWh
|
$8,407
-
kW-mo/yr
|
|
| 04 | 2.6218: Turn off equipment when not in use | $56,948 | $10,000 |
$51,948
618,836
kWh
|
$5,000
-
kW-mo/yr
|
|
| 05 | 2.7425: Clean or color roof to reduce solar load | $24,293 | $1,600 |
$21,615
270,192
kWh
|
$2,678
-
kW-mo/yr
|
|
| 06 | 2.7122: Disconnect ballasts | $3,090 | $900 |
$2,750
34,380
kWh
|
$340
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $431,504 | $44,500 |
$385,216
4,784,677
kWh
|
$46,288
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $327,855 | $14,000 |
$292,992
3,631,873
kWh
|
$34,863
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs