ITAC Assessment: MI0185
ITAC logo
ITAC Assessment: MI0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product beer
NAICS 424810: Beer and Ale Merchant Wholesalers
SIC 5181: Beer and Ale
Sales Range $10
M
to 50
M
# of Employees 395
Plant Area 250,000
ft2
Annual Production 100,000
Tgal
Production Hrs. Annual 6,732
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,186,269 11,702,400
kWh
Electricity Demand $269,848 32,936
kW-mo/yr
Electricity Fees $8,830 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $279,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $156,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.2414: Use waste heat from hot flue gases to preheat $123,100 $64,000 - - $123,100
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $83,014 $1,500 - - $83,014
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $37,375 $60 $30,572
436,736
kWh
$6,803
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,482 $920 $18,182
265,042
kWh
$300
-
kW-mo/yr
-
05 2.2113: Repair or replace steam traps $12,330 $800 - - $12,330
-
MMBtu
06 2.7496: Install partitions to reduce size of conditioned space $5,182 $640 $4,813
25,332
kWh
$369
-
kW-mo/yr
-
TOTAL RECOMMENDED $279,483 $67,920 $53,567
727,110
kWh
$7,472
-
kW-mo/yr
$218,444
-
MMBtu
TOTAL IMPLEMENTED $156,383 $3,920 $53,567
727,110
kWh
$7,472
-
kW-mo/yr
$95,344
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings