ITAC Assessment: MI0181
ITAC logo
ITAC Assessment: MI0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Pacemakers
NAICS 334510: Electromedical and Electrotherapeutic Apparatus Manufacturing
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 125,000
ft2
Annual Production 25,000
units
Production Hrs. Annual 4,590
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,770,160 15,493,680
kWh
Electricity Demand $219,483 28,504
kW-mo/yr
Electricity Fees $450 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $480,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $416,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $218,599 $25,000 $192,927
1,105,209
kWh
$25,672
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $143,524 $2,000 $135,183
773,460
kWh
$8,341
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $62,935 $60,000 $59,208
338,748
kWh
$3,727
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $50,254 $2,000 $47,333
270,820
kWh
$2,921
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,674 $1,210 $2,366
13,540
kWh
$1,308
-
kW-mo/yr
06 2.4323: Use optimum size and capacity equipment $1,403 $4,531 $1,243
7,112
kWh
$160
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $310 $40 $234
2,117
kWh
$76
-
kW-mo/yr
TOTAL RECOMMENDED $480,699 $94,781 $438,494
2,511,006
kWh
$42,205
-
kW-mo/yr
TOTAL IMPLEMENTED $416,361 $30,250 $378,043
2,165,146
kWh
$38,318
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings