Assessment Year | 2008 |
---|---|
Principal Product | Windows |
NAICS | 332321: Metal Window and Door Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $10 M to 50M |
# of Employees | 435 |
Plant Area |
350,000
ft2
|
Annual Production | 25,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $583,035 | 8,083,353 |
kWh
|
$0.072 |
Electricity Demand | $189,020 | 18,923 |
kW-mo/yr
|
$9.99 |
Electricity Fees | $120,576 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $302,439 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,354 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2628: Utilize a less expensive cooling method | $214,998 | $360,000 |
$183,590
2,295,079
kWh
|
$31,408
-
kW-mo/yr
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $32,694 | $2,000 |
$27,689
350,488
kWh
|
$5,005
-
kW-mo/yr
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $21,544 | $40 |
$18,219
228,397
kWh
|
$3,325
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,041 | $1,210 |
$17,486
219,208
kWh
|
$1,555
-
kW-mo/yr
|
|
05 | 2.4323: Use optimum size and capacity equipment | $10,087 | $13,200 |
$8,798
110,295
kWh
|
$1,289
-
kW-mo/yr
|
|
06 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $4,075 | $322 |
$3,467
43,457
kWh
|
$608
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $302,439 | $376,772 |
$259,249
3,246,924
kWh
|
$43,190
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $77,354 | $3,572 |
$66,861
841,550
kWh
|
$10,493
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs