ITAC Assessment: MI0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Windows
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 435
Plant Area 350,000
ft2
Annual Production 25,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $583,035 8,083,353
kWh
Electricity Demand $189,020 18,923
kW-mo/yr
Electricity Fees $120,576 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $302,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,354

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2628: Utilize a less expensive cooling method $214,998 $360,000 $183,590
2,295,079
kWh
$31,408
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $32,694 $2,000 $27,689
350,488
kWh
$5,005
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $21,544 $40 $18,219
228,397
kWh
$3,325
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,041 $1,210 $17,486
219,208
kWh
$1,555
-
kW-mo/yr
05 2.4323: Use optimum size and capacity equipment $10,087 $13,200 $8,798
110,295
kWh
$1,289
-
kW-mo/yr
06 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $4,075 $322 $3,467
43,457
kWh
$608
-
kW-mo/yr
TOTAL RECOMMENDED $302,439 $376,772 $259,249
3,246,924
kWh
$43,190
-
kW-mo/yr
TOTAL IMPLEMENTED $77,354 $3,572 $66,861
841,550
kWh
$10,493
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs