ITAC Assessment: MI0170
ITAC logo
ITAC Assessment: MI0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Plastic Bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 47,000
ft2
Annual Production 8,700,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $479,696 2,675,400
kWh
Electricity Demand $64,857 8,007
kW-mo/yr
Electricity Fees $2,427 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2511: Insulate bare equipment $61,285 $976 $57,532
321,284
kWh
$3,753
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $17,359 $3,320 $16,298
91,012
kWh
$1,061
-
kW-mo/yr
03 2.4323: Use optimum size and capacity equipment $5,311 $13,680 $5,088
28,415
kWh
$223
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,299 $1,210 $4,423
24,702
kWh
$876
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,909 $3,370 $4,617
25,782
kWh
$292
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,474 $40 $2,286
12,765
kWh
$188
-
kW-mo/yr
TOTAL RECOMMENDED $96,637 $22,596 $90,244
503,960
kWh
$6,393
-
kW-mo/yr
TOTAL IMPLEMENTED $96,637 $22,596 $90,244
503,960
kWh
$6,393
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs