ITAC Assessment: MI0158
ITAC logo
ITAC Assessment: MI0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Medical and Laboratory Rubber Sundries
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 125,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,047,150 13,922,476
kWh
Electricity Demand $83,644 24,822
kW-mo/yr
Electricity Fees $73,853 -
Natural Gas $527,254 452,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $246,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $206,219

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $92,023 $8,580 $86,729
1,077,381
kWh
$5,294
-
kW-mo/yr
-
02 2.4322: Use or replace with energy efficient substitutes $55,437 $101,347 $45,097
560,166
kWh
$10,340
-
kW-mo/yr
-
03 2.7425: Clean or color roof to reduce solar load $21,358 $46,238 $20,174
250,605
kWh
$1,184
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $21,963 $20,900 $20,745
257,712
kWh
$1,218
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,507 $1,210 $14,088
175,000
kWh
$419
-
kW-mo/yr
-
06 2.2113: Repair or replace steam traps $13,330 $1,700 - - $13,330
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,478 $5,967 $9,433
117,307
kWh
$45
-
kW-mo/yr
-
08 2.4323: Use optimum size and capacity equipment $9,282 $3,475 $9,009
111,909
kWh
$273
-
kW-mo/yr
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $5,073 $40 $4,732
58,778
kWh
$341
-
kW-mo/yr
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $3,886 $2,000 - - $3,886
-
MMBtu
TOTAL RECOMMENDED $246,337 $191,457 $210,007
2,608,858
kWh
$19,114
-
kW-mo/yr
$17,216
-
MMBtu
TOTAL IMPLEMENTED $206,219 $135,777 $171,391
2,129,037
kWh
$17,612
-
kW-mo/yr
$17,216
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs