| Assessment Year | 2007 |
|---|---|
| Principal Product | Medical and Laboratory Rubber Sundries |
| NAICS | 326299: All Other Rubber Product Manufacturing |
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
125,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,047,150 | 13,922,476 |
kWh
|
$0.075 |
| Electricity Demand | $83,644 | 24,822 |
kW-mo/yr
|
$3.37 |
| Electricity Fees | $73,853 | - |
|
- |
| Natural Gas | $527,254 | 452,950 |
MMBtu
|
$1.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $246,337 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $206,219 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $92,023 | $8,580 |
$86,729
1,077,381
kWh
|
$5,294
-
kW-mo/yr
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $55,437 | $101,347 |
$45,097
560,166
kWh
|
$10,340
-
kW-mo/yr
|
- | |
| 03 | 2.7425: Clean or color roof to reduce solar load | $21,358 | $46,238 |
$20,174
250,605
kWh
|
$1,184
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,963 | $20,900 |
$20,745
257,712
kWh
|
$1,218
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,507 | $1,210 |
$14,088
175,000
kWh
|
$419
-
kW-mo/yr
|
- | |
| 06 | 2.2113: Repair or replace steam traps | $13,330 | $1,700 | - | - |
$13,330
-
MMBtu
|
|
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,478 | $5,967 |
$9,433
117,307
kWh
|
$45
-
kW-mo/yr
|
- | |
| 08 | 2.4323: Use optimum size and capacity equipment | $9,282 | $3,475 |
$9,009
111,909
kWh
|
$273
-
kW-mo/yr
|
- | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,073 | $40 |
$4,732
58,778
kWh
|
$341
-
kW-mo/yr
|
- | |
| 10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,886 | $2,000 | - | - |
$3,886
-
MMBtu
|
|
| TOTAL RECOMMENDED | $246,337 | $191,457 |
$210,007
2,608,858
kWh
|
$19,114
-
kW-mo/yr
|
$17,216
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $206,219 | $135,777 |
$171,391
2,129,037
kWh
|
$17,612
-
kW-mo/yr
|
$17,216
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs