Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Fiberglass boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area 1,000,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,908 5,747,842
kWh
Electricity Demand $61,927 17,950
kW-mo/yr
Electricity Fees $23,616 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $91,892 $111,815 $85,415
1,041,645
kWh
$6,477
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,557 $1,210 $8,780
107,077
kWh
$2,777
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,187 $40 $1,004
12,242
kWh
$183
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,330 $1,210 $2,198
26,804
kWh
$132
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,639 $40 $1,482
18,073
kWh
$157
-
kW-mo/yr
06 2.4323: Use optimum size and capacity equipment $3,802 $3,475 $3,501
42,692
kWh
$301
-
kW-mo/yr
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,172 $1,210 $2,069
25,225
kWh
$103
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,540 $40 $1,358
16,555
kWh
$182
-
kW-mo/yr
09 2.4323: Use optimum size and capacity equipment $1,765 $3,475 $1,693
20,647
kWh
$72
-
kW-mo/yr
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,435 $1,210 $1,279
15,600
kWh
$156
-
kW-mo/yr
TOTAL RECOMMENDED $119,319 $123,725 $108,779
1,326,560
kWh
$10,540
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs