ITAC Assessment: MI0139
ITAC logo
ITAC Assessment: MI0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aluminum Tubing
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,311,464 17,556,420
kWh
Electricity Demand $412,640 52,167
kW-mo/yr
Electricity Fees $243,274 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $36,785 $1,074 $31,595
422,962
kWh
$5,190
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $26,909 $30 $20,740
277
kWh
$6,169
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $25,014 $50,232 $21,407
286
kWh
$3,607
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,787 $40,200 $13,240
177
kWh
$2,547
-
kW-mo/yr
05 2.2437: Recover waste heat from equipment $3,192 $5,000 $3,192
93
kWh
-
TOTAL RECOMMENDED $107,687 $96,536 $90,174
423,795
kWh
$17,513
-
kW-mo/yr
TOTAL IMPLEMENTED $66,886 $6,104 $55,527
423,332
kWh
$11,359
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs