| Assessment Year | 2006 |
|---|---|
| Principal Product | Cigarettes |
| NAICS | 312230: Tobacco Manufacturing |
| SIC | 2111: Cigarettes |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
65,000
ft2
|
| Annual Production | 4,212,000,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $90,079 | 1,573,200 |
kWh
|
$0.057 |
| Electricity Demand | $51,272 | 6,192 |
kW-mo/yr
|
$8.28 |
| Electricity Fees | $28,264 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,012 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,355 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $7,657 | $600 | - | - | $7,657 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,436 | $1,074 |
$5,203
69,183
kWh
|
$2,233
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,902 | $30 |
$2,754
36,618
kWh
|
$1,148
-
kW-mo/yr
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $1,327 | $48 |
$826
14,414
kWh
|
$501
-
kW-mo/yr
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,128 | $175 |
$980
13,034
kWh
|
$148
-
kW-mo/yr
|
- | |
| 06 | 2.4323: Use optimum size and capacity equipment | $901 | $3,400 |
$713
9,478
kWh
|
$188
-
kW-mo/yr
|
- | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $661 | $2,809 |
$571
7,593
kWh
|
$90
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $23,012 | $8,136 |
$11,047
150,320
kWh
|
$4,308
-
kW-mo/yr
|
$7,657 | ||
| TOTAL IMPLEMENTED | $15,355 | $7,536 |
$11,047
150,320
kWh
|
$4,308
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs