Assessment Year | 2006 |
---|---|
Principal Product | Bread, rolls, muffins |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $1 M to 5M |
# of Employees | 195 |
Plant Area |
104,000
ft2
|
Annual Production | 43,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $260,864 | 5,261,135 |
kWh
|
$0.050 |
Electricity Demand | $57,397 | 19,426 |
kW-mo/yr
|
$2.95 |
Electricity Fees | $44,511 | - |
|
- |
Natural Gas | $607,568 | 56,480 |
MMBtu
|
$10.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $145,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,059 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $78,238 | $4,445 | - | - |
$78,238
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $19,974 | $5,000 |
$18,132
374,552
kWh
|
$1,842
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,372 | $31,540 |
$16,876
348,600
kWh
|
$1,496
-
kW-mo/yr
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,248 | $1,750 | - | - |
$10,248
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,703 | $1,074 |
$8,263
170,693
kWh
|
$1,440
-
kW-mo/yr
|
- | |
06 | 2.4323: Use optimum size and capacity equipment | $6,762 | $4,800 |
$6,545
135,197
kWh
|
$217
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,984 | $30 |
$1,825
37,707
kWh
|
$159
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $145,281 | $48,639 |
$51,641
1,066,749
kWh
|
$5,154
-
kW-mo/yr
|
$88,486
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,059 | $32,644 |
$26,964
557,000
kWh
|
$3,095
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs