Assessment Year | 2006 |
---|---|
Principal Product | fire hose |
NAICS | 313220: Narrow Fabric Mills and Schiffli Machine Embroidery |
SIC | 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 21,000
thousand feet
|
Production Hrs. Annual | 7,350
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,701 | 1,461,900 |
kWh
|
$0.057 |
Electricity Demand | $29,877 | 3,711 |
kW-mo/yr
|
$8.05 |
Electricity Fees | $13,070 | - |
|
- |
Natural Gas | $110,892 | 7,215 |
MMBtu
|
$15.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,484 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $17,617 | $16,000 | - | - |
$17,617
-
MMBtu
|
- | - | |
02 | 2.2136: Install / repair insulation on steam lines | $8,323 | $1,020 | - | - |
$8,323
-
MMBtu
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $6,331 | $212 |
$4,990
88,200
kWh
|
$861
-
kW-mo/yr
|
- | - | $480 | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,497 | $1,750 | - | - |
$1,497
-
MMBtu
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,474 | - |
$1,440
25,715
kWh
|
$34
-
kW-mo/yr
|
- | - | - | |
06 | 4.131: Modify process to reduce material use/cost | $42,242 | $140 |
$242
4,307
kWh
|
- | - | $42,000 | - | |
TOTAL RECOMMENDED | $77,484 | $19,122 |
$6,672
118,222
kWh
|
$895
-
kW-mo/yr
|
$27,437
-
MMBtu
|
$42,000 | $480 | ||
TOTAL IMPLEMENTED | $77,484 | $19,122 |
$6,672
118,222
kWh
|
$895
-
kW-mo/yr
|
$27,437
-
MMBtu
|
$42,000 | $480 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs