ITAC Assessment: MI0126
ITAC logo
ITAC Assessment: MI0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product fire hose
NAICS 313220: Narrow Fabric Mills and Schiffli Machine Embroidery
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 21,000
thousand feet
Production Hrs. Annual 7,350
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,701 1,461,900
kWh
Electricity Demand $29,877 3,711
kW-mo/yr
Electricity Fees $13,070 -
Natural Gas $110,892 7,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $17,617 $16,000 - - $17,617
-
MMBtu
- -
02 2.2136: Install / repair insulation on steam lines $8,323 $1,020 - - $8,323
-
MMBtu
- -
03 2.7111: Reduce illumination to minimum necessary levels $6,331 $212 $4,990
88,200
kWh
$861
-
kW-mo/yr
- - $480
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,497 $1,750 - - $1,497
-
MMBtu
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,474 - $1,440
25,715
kWh
$34
-
kW-mo/yr
- - -
06 4.131: Modify process to reduce material use/cost $42,242 $140 $242
4,307
kWh
- - $42,000 -
TOTAL RECOMMENDED $77,484 $19,122 $6,672
118,222
kWh
$895
-
kW-mo/yr
$27,437
-
MMBtu
$42,000 $480
TOTAL IMPLEMENTED $77,484 $19,122 $6,672
118,222
kWh
$895
-
kW-mo/yr
$27,437
-
MMBtu
$42,000 $480
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs