ITAC Assessment: MI0121
ITAC logo
ITAC Assessment: MI0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Plastic Injection Molding
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 15,000
ft2
Annual Production 60,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,371 1,569,767
kWh
Electricity Demand $25,454 3,199
kW-mo/yr
Electricity Fees $12,105 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,893

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7221: Lower temperature during the winter season and vice-versa $5,669 - $4,539
81,996
kWh
$1,130
-
kW-mo/yr
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,836 $122 $3,087
53,759
kWh
$749
-
kW-mo/yr
03 2.2511: Insulate bare equipment $2,209 $420 $1,769
31,963
kWh
$440
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,015 $964 $1,658
29,941
kWh
$357
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $996 $56 $722
13,038
kWh
$274
-
kW-mo/yr
06 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $362 - $292
5,076
kWh
$70
-
kW-mo/yr
TOTAL RECOMMENDED $15,087 $1,562 $12,067
215,773
kWh
$3,020
-
kW-mo/yr
TOTAL IMPLEMENTED $9,893 $1,384 $7,966
143,900
kWh
$1,927
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs