| Assessment Year | 2005 |
|---|---|
| Principal Product | Asphalt |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
100,000
ft2
|
| Annual Production | 5,000,000
ton
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,905 | 1,149,600 |
kWh
|
$0.052 |
| Electricity Demand | $49,215 | 5,935 |
kW-mo/yr
|
$8.29 |
| Electricity Fees | $11,730 | - |
|
- |
| Other Gas | $1,863,020 | 931,281 |
MMBtu
|
$2.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $332,807 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1116: Improve combustion control capability | $178,061 | $75,000 | - | - |
$178,061
-
MMBtu
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $145,490 | $5,540 | - | - |
$145,490
-
MMBtu
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,318 | - |
$2,721
2,721
kWh
|
$2,597
-
kW-mo/yr
|
- | |
| 04 | 2.4323: Use optimum size and capacity equipment | $1,956 | $5,024 |
$1,526
29,289
kWh
|
$430
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,982 | $56 |
$938
18,000
kWh
|
$1,044
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $332,807 | $85,620 |
$5,185
50,010
kWh
|
$4,071
-
kW-mo/yr
|
$323,551
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs