ITAC Assessment: MI0120
ITAC logo
ITAC Assessment: MI0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 5,000,000
ton
Production Hrs. Annual 2,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,905 1,149,600
kWh
Electricity Demand $49,215 5,935
kW-mo/yr
Electricity Fees $11,730 -
Other Gas $1,863,020 931,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $332,807 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings
01 2.1116: Improve combustion control capability $178,061 $75,000 - - $178,061
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $145,490 $5,540 - - $145,490
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,318 - $2,721
2,721
kWh
$2,597
-
kW-mo/yr
-
04 2.4323: Use optimum size and capacity equipment $1,956 $5,024 $1,526
29,289
kWh
$430
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,982 $56 $938
18,000
kWh
$1,044
-
kW-mo/yr
-
TOTAL RECOMMENDED $332,807 $85,620 $5,185
50,010
kWh
$4,071
-
kW-mo/yr
$323,551
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs