Assessment Year | 2005 |
---|---|
Principal Product | industrial hydraulic valves |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 380 |
Plant Area |
50,000
ft2
|
Annual Production | 650,000
pieces
|
Production Hrs. Annual | 5,250
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $306,863 | 6,006,400 |
kWh
|
$0.051 |
Electricity Demand | $113,467 | 13,741 |
kW-mo/yr
|
$8.26 |
Electricity Fees | $27,888 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,038 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,373 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $16,898 | $1,350 |
$16,898
330,750
kWh
|
- | - | - | |
02 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $4,463 | $11,400 |
$(-95.0)
(-1,865)
kWh
|
- | - | $4,558 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,012 | $906 |
$2,679
52,441
kWh
|
$1,557
-
kW-mo/yr
|
$(-224.0) | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,621 | $56 |
$1,968
38,518
kWh
|
$653
-
kW-mo/yr
|
- | - | |
05 | 2.4323: Use optimum size and capacity equipment | $1,044 | $5,024 |
$843
16,493
kWh
|
$201
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $29,038 | $18,736 |
$22,293
436,337
kWh
|
$2,411
-
kW-mo/yr
|
$(-224.0) | $4,558 | ||
TOTAL IMPLEMENTED | $25,373 | $13,656 |
$19,482
381,326
kWh
|
$1,557
-
kW-mo/yr
|
$(-224.0) | $4,558 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs