ITAC Assessment: MI0111
ITAC logo
ITAC Assessment: MI0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Biomedical devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 350,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 6,350
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $678,634 13,572,800
kWh
Electricity Demand $191,761 23,413
kW-mo/yr
Electricity Fees $126,143 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7111: Reduce illumination to minimum necessary levels $13,372 $200 $10,937
207,914
kWh
$2,435
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $13,290 $84 $13,290
251,551
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,062 $7,706 $3,328
65,350
kWh
$734
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,249 - $2,662
52,280
kWh
$587
-
kW-mo/yr
05 2.4322: Use or replace with energy efficient substitutes $873 $1,673 $726
13,260
kWh
$147
-
kW-mo/yr
TOTAL RECOMMENDED $34,846 $9,663 $30,943
590,355
kWh
$3,903
-
kW-mo/yr
TOTAL IMPLEMENTED $17,352 $7,790 $16,618
316,901
kWh
$734
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs