Assessment Year | 2005 |
---|---|
Principal Product | Woodworking |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
70,000
ft2
|
Annual Production | 25,000
thousand feet
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,624 | 962,257 |
kWh
|
$0.053 |
Electricity Demand | $31,854 | 4,725 |
kW-mo/yr
|
$6.74 |
Electricity Fees | $14,886 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,126 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,887 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $19,885 | $760 |
$760
5,052
kWh
|
- | $19,125 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,649 | $12,563 |
$7,143
135,762
kWh
|
$2,506
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $6,418 | $225 |
$6,418
108,099
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,194 | $862 |
$1,866
24,937
kWh
|
- | $(-672.0) | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,390 | $56 |
$1,390
14,851
kWh
|
- | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $834 | $600 |
$834
-
kWh
|
- | - | |
07 | 2.4323: Use optimum size and capacity equipment | $756 | $1,536 |
$756
8,531
kWh
|
- | - | |
TOTAL RECOMMENDED | $40,126 | $16,602 |
$19,167
297,232
kWh
|
$2,506
-
kW-mo/yr
|
$18,453 | ||
TOTAL IMPLEMENTED | $28,887 | $1,903 |
$10,434
152,939
kWh
|
- | $18,453 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs