ITAC Assessment: MI0106
ITAC logo
ITAC Assessment: MI0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Woodworking
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 25,000
thousand feet
Production Hrs. Annual 2,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,624 962,257
kWh
Electricity Demand $31,854 4,725
kW-mo/yr
Electricity Fees $14,886 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $19,885 $760 $760
5,052
kWh
- $19,125
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,649 $12,563 $7,143
135,762
kWh
$2,506
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $6,418 $225 $6,418
108,099
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,194 $862 $1,866
24,937
kWh
- $(-672.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,390 $56 $1,390
14,851
kWh
- -
06 2.8114: Change rate schedules or other changes in utility service $834 $600 $834
-
kWh
- -
07 2.4323: Use optimum size and capacity equipment $756 $1,536 $756
8,531
kWh
- -
TOTAL RECOMMENDED $40,126 $16,602 $19,167
297,232
kWh
$2,506
-
kW-mo/yr
$18,453
TOTAL IMPLEMENTED $28,887 $1,903 $10,434
152,939
kWh
- $18,453
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs