ITAC Assessment: MI0102
ITAC logo
ITAC Assessment: MI0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Glass windows manufactured from purchased glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 99
Plant Area 60,000
ft2
Annual Production 17,030,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $359,540 6,081,998
kWh
Electricity Demand $109,909 15,160
kW-mo/yr
Electricity Fees $82,761 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $201,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $100,313 $40,224 $100,313
3,165,581
kWh
- - -
02 4.111: Add equipment/ operators to reduce production bottleneck $66,212 $29,320 $2,512
36,917
kWh
- $63,700 -
03 4.123: Reduce defects by reducing product tipping $23,325 $1,104 $325
4,464
kWh
- - $23,000
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,890 $162 $7,890
116,413
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,049 $870 $4,529
68,768
kWh
$(-480.0) - -
TOTAL RECOMMENDED $201,789 $71,680 $115,569
3,392,143
kWh
$(-480.0) $63,700 $23,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs