ITAC Assessment: MI0081
ITAC logo
ITAC Assessment: MI0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Industrial injection molded plastic products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 105,000
ft2
Annual Production 520,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $503,368 10,670,400
kWh
Electricity Demand $173,010 21,208
kW-mo/yr
Electricity Fees $73,723 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.8114: Change rate schedules or other changes in utility service $18,276 $600 - - $18,276 -
02 2.4133: Use most efficient type of electric motors $1,092 $3,064 $1,092
16,970
kWh
- - -
03 2.2511: Insulate bare equipment $11,977 $1,982 $1,993
55,776
kWh
- - $9,984
04 4.131: Modify process to reduce material use/cost $21,570 $30,000 - - - $21,570
05 2.7221: Lower temperature during the winter season and vice-versa $2,291 $360 $2,291
48,840
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,474 $590 $4,554
91,760
kWh
$(-2,080.0) - -
TOTAL RECOMMENDED $57,680 $36,596 $9,930
213,346
kWh
$(-2,080.0) $18,276 $31,554
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs