ITAC Assessment: MI0079
ITAC logo
ITAC Assessment: MI0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Juice extraction, packaging and pellets
NAICS 311421: Fruit and Vegetable Canning
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 254,800
ft2
Annual Production 214,986
ton
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $634,626 13,584,648
kWh
Electricity Demand $238,810 29,746
kW-mo/yr
Electricity Fees $11,992 -
Fuel Oil #6 $3,422,952 539,487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $370,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $21,521 $600 - - $21,521
02 2.2136: Install / repair insulation on steam lines $7,957 $1,649 - $7,957
-
MMBtu
-
03 2.1221: Replace obsolete burners with more efficient ones $108,501 $33,050 - $108,501
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,693 $250 $1,693
33,916
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $138,625 $68,380 - $138,625
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,937 $61,795 $19,937
399,483
kWh
- -
07 2.2511: Insulate bare equipment $778 $178 $778
15,594
kWh
- -
08 2.2136: Install / repair insulation on steam lines $3,053 $450 - $3,053
-
MMBtu
-
09 2.2135: Repair and eliminate steam leaks $60,234 $5,408 - $60,234
-
MMBtu
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,416 $2,670 $4,416
88,483
kWh
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,690 - $3,690
73,790
kWh
- -
TOTAL RECOMMENDED $370,405 $174,430 $30,514
611,266
kWh
$318,370
-
MMBtu
$21,521
TOTAL IMPLEMENTED $138,625 $68,380 - $138,625
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs