ITAC Assessment: MI0078
ITAC logo
ITAC Assessment: MI0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Citrus fruit packaging
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2030:
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 102,150
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,851 2,122,080
kWh
Electricity Demand $47,156 5,786
kW-mo/yr
Electricity Fees $12,453 -
LPG $41,784 3,751
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $221,288 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $168,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings Primary Product Savings
01 2.8114: Change rate schedules or other changes in utility service $20,512 $600 - - $20,512 -
02 2.6218: Turn off equipment when not in use $12,574 $2,300 $12,574
245,103
kWh
- - -
03 2.6218: Turn off equipment when not in use $3,925 - $3,925
80,417
kWh
- - -
04 2.7492: Use proper thickness of insulation on building envelope $6,702 $3,693 $6,702
141,047
kWh
- - -
05 4.423: Move product using mechanical means $168,750 $6,904 - - - $168,750
06 2.7134: Use photocell controls $2,151 $2,661 $2,151
45,276
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,680 $2,670 $1,680
35,353
kWh
- - -
08 2.1135: Repair furnaces and oven doors so that they seal efficiently $2,345 $239 - $2,345
-
MMBtu
- -
09 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,649 $15,260 $2,649
55,769
kWh
- - -
TOTAL RECOMMENDED $221,288 $34,327 $29,681
602,965
kWh
$2,345
-
MMBtu
$20,512 $168,750
TOTAL IMPLEMENTED $168,750 $6,904 - - - $168,750
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs