Assessment Year | 2003 |
---|---|
Principal Product | Metal Fabrication |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 26 |
Plant Area |
32,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,772 | 594,960 |
kWh
|
$0.050 |
Electricity Demand | $17,707 | 2,292 |
kW-mo/yr
|
$7.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,984 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $800 | $536 |
$800
11,422
kWh
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $643 | $636 |
$643
9,186
kWh
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,637 | $4,051 |
$1,637
23,391
kWh
|
|
04 | 2.7135: Install occupancy sensors | $432 | $612 |
$432
6,166
kWh
|
|
05 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,238 | $60 |
$1,238
8,810
kWh
|
|
06 | 2.7232: Replace existing hvac unit with high efficiency model | $5,117 | $17,250 |
$5,117
73,102
kWh
|
|
07 | 2.6218: Turn off equipment when not in use | $1,490 | $175 |
$1,490
21,291
kWh
|
|
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $729 | $33 |
$729
10,414
kWh
|
|
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $217 | $220 |
$217
3,102
kWh
|
|
TOTAL RECOMMENDED | $12,303 | $23,573 |
$12,303
166,884
kWh
|
||
TOTAL IMPLEMENTED | $2,984 | $849 |
$2,984
33,748
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs