ITAC Assessment: MI0062
ITAC logo
ITAC Assessment: MI0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Soft drink manufacturing
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 32
Plant Area 113,230
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $500,178 7,145,394
kWh
Natural Gas $72,000 12,329
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,054 $24 $5,054
72,220
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,418 $581 $1,418
20,257
kWh
- -
03 2.2136: Install / repair insulation on steam lines $338 $217 - - $338
-
MMBtu
04 2.6218: Turn off equipment when not in use $5,928 $169 $5,928
84,686
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $1,459 $2,945 $1,244
17,776
kWh
$215
-
kW-mo/yr
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $10,888 $196 $10,888
546,307
kWh
- -
07 2.6218: Turn off equipment when not in use $119,292 $8,840 $119,292
1,704,169
kWh
- -
TOTAL RECOMMENDED $144,377 $12,972 $143,824
2,445,415
kWh
$215
-
kW-mo/yr
$338
-
MMBtu
TOTAL IMPLEMENTED $17,698 $1,018 $17,360
638,784
kWh
- $338
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs