Assessment Year | 2003 |
---|---|
Principal Product | Soft drink manufacturing |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 32 |
Plant Area |
113,230
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $500,178 | 7,145,394 |
kWh
|
$0.070 |
Natural Gas | $72,000 | 12,329 |
MMBtu
|
$5.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $144,377 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,698 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,054 | $24 |
$5,054
72,220
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,418 | $581 |
$1,418
20,257
kWh
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $338 | $217 | - | - |
$338
-
MMBtu
|
|
04 | 2.6218: Turn off equipment when not in use | $5,928 | $169 |
$5,928
84,686
kWh
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $1,459 | $2,945 |
$1,244
17,776
kWh
|
$215
-
kW-mo/yr
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,888 | $196 |
$10,888
546,307
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $119,292 | $8,840 |
$119,292
1,704,169
kWh
|
- | - | |
TOTAL RECOMMENDED | $144,377 | $12,972 |
$143,824
2,445,415
kWh
|
$215
-
kW-mo/yr
|
$338
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,698 | $1,018 |
$17,360
638,784
kWh
|
- |
$338
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs