Assessment Year | 2003 |
---|---|
Principal Product | Pharmaceutical (Tablets & Capsules) |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 76 |
Plant Area |
60,868
ft2
|
Annual Production | 375,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,911 | 5,191,815 |
kWh
|
$0.047 |
Electricity Demand | $119,516 | 3,393 |
kW-mo/yr
|
$35.22 |
Natural Gas | $95,228 | 15,585 |
MMBtu
|
$6.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $291,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $265,426 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $11,548 | $2,000 | - | - | - | $11,548 | |
02 | 2.2113: Repair or replace steam traps | $1,906 | $696 | - |
$1,906
-
MMBtu
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,543 | $223 |
$1,543
22,043
kWh
|
- | - | - | |
04 | 3.4155: Meter waste water | $12,786 | $1,950 | - | - |
$12,786
-
Tgal
|
- | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $250,000 | $43,000 | - | - |
$250,000
-
Tgal
|
- | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $13,520 | $400,000 |
$13,520
193,143
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $291,303 | $447,869 |
$15,063
215,186
kWh
|
$1,906
-
MMBtu
|
$262,786
-
Tgal
|
$11,548 | ||
TOTAL IMPLEMENTED | $265,426 | $443,696 |
$13,520
193,143
kWh
|
$1,906
-
MMBtu
|
$250,000
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs