ITAC Assessment: MI0058
ITAC logo
ITAC Assessment: MI0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pharmaceutical (Tablets & Capsules)
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 76
Plant Area 60,868
ft2
Annual Production 375,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,911 5,191,815
kWh
Electricity Demand $119,516 3,393
kW-mo/yr
Natural Gas $95,228 15,585
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $291,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $265,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $11,548 $2,000 - - - $11,548
02 2.2113: Repair or replace steam traps $1,906 $696 - $1,906
-
MMBtu
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,543 $223 $1,543
22,043
kWh
- - -
04 3.4155: Meter waste water $12,786 $1,950 - - $12,786
-
Tgal
-
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $250,000 $43,000 - - $250,000
-
Tgal
-
06 2.7232: Replace existing hvac unit with high efficiency model $13,520 $400,000 $13,520
193,143
kWh
- - -
TOTAL RECOMMENDED $291,303 $447,869 $15,063
215,186
kWh
$1,906
-
MMBtu
$262,786
-
Tgal
$11,548
TOTAL IMPLEMENTED $265,426 $443,696 $13,520
193,143
kWh
$1,906
-
MMBtu
$250,000
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs