Assessment Year | 2002 |
---|---|
Principal Product | Office Furniture |
NAICS |
n/a
|
SIC | 2521: Wood Office Furniture |
Sales Range | $5 M to 10M |
# of Employees | 102 |
Plant Area |
75,000
ft2
|
Annual Production | 6,400
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $30,314 | 461,280 |
kWh
|
$0.066 |
Electricity Demand | $18,296 | 2,376 |
kW-mo/yr
|
$7.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,978 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,678 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,880 | $52 |
$2,880
43,636
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $929 | $2 |
$929
14,076
kWh
|
- | - | - | |
03 | 3.6192: Use a less expensive method of waste removal | $9,623 | $8 | - | - |
$9,623
-
lb
|
- | |
04 | 4.522: Modify storage space to avoid rental of a warehouse | $8,400 | $995 | - | - | - | $8,400 | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $398 | $250 |
$398
6,018
kWh
|
- | - | - | |
06 | 2.4112: Install soft-start to eliminate nuisance trips | $9,354 | $6,035 | - |
$9,354
-
kW-mo/yr
|
- | - | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $6,394 | $9,000 |
$3,861
58,500
kWh
|
$2,533
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $37,978 | $16,342 |
$8,068
122,230
kWh
|
$11,887
-
kW-mo/yr
|
$9,623
-
lb
|
$8,400 | ||
TOTAL IMPLEMENTED | $11,678 | $1,297 |
$3,278
49,654
kWh
|
- | - | $8,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs