ITAC Assessment: MI0036
ITAC logo
ITAC Assessment: MI0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Office Furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $5
M
to 10
M
# of Employees 102
Plant Area 75,000
ft2
Annual Production 6,400
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,314 461,280
kWh
Electricity Demand $18,296 2,376
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,880 $52 $2,880
43,636
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $929 $2 $929
14,076
kWh
- - -
03 3.6192: Use a less expensive method of waste removal $9,623 $8 - - $9,623
-
lb
-
04 4.522: Modify storage space to avoid rental of a warehouse $8,400 $995 - - - $8,400
05 2.6212: Turn off equipment during breaks, reduce operating time $398 $250 $398
6,018
kWh
- - -
06 2.4112: Install soft-start to eliminate nuisance trips $9,354 $6,035 - $9,354
-
kW-mo/yr
- -
07 2.7232: Replace existing hvac unit with high efficiency model $6,394 $9,000 $3,861
58,500
kWh
$2,533
-
kW-mo/yr
- -
TOTAL RECOMMENDED $37,978 $16,342 $8,068
122,230
kWh
$11,887
-
kW-mo/yr
$9,623
-
lb
$8,400
TOTAL IMPLEMENTED $11,678 $1,297 $3,278
49,654
kWh
- - $8,400