ITAC Assessment: MI0035
ITAC logo
ITAC Assessment: MI0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 128,000
ft2
Annual Production 470,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,854 3,463,980
kWh
Electricity Demand $78,473 9,666
kW-mo/yr
Natural Gas $40,304 5,994
MMBtu
LPG $38,912 30,883
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,542 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,743

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $10,558 $975 $10,558
159,964
kWh
- -
02 2.4112: Install soft-start to eliminate nuisance trips $29,975 $12,885 - $29,975
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,768 $240 - - $6,768
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,825 $2,000 - - $5,825
05 2.7232: Replace existing hvac unit with high efficiency model $2,597 $3,500 $2,101
31,824
kWh
$496
-
kW-mo/yr
-
06 2.2136: Install / repair insulation on steam lines $819 $240 - - $819
TOTAL RECOMMENDED $56,542 $19,840 $12,659
191,788
kWh
$30,471
-
kW-mo/yr
$13,412
TOTAL IMPLEMENTED $36,743 $13,125 - $29,975
-
kW-mo/yr
$6,768
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs