ITAC Assessment: MI0029
ITAC logo
ITAC Assessment: MI0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Bakery Products
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 52
Plant Area 115,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $733,969 11,499,372
kWh
Natural Gas $330,237 40,563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,612

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 3.4155: Meter waste water $73,069 $3,650 - - $73,069
-
Tgal
-
02 4.111: Add equipment/ operators to reduce production bottleneck $55,380 $42,432 - - - $55,380
03 2.7111: Reduce illumination to minimum necessary levels $19,287 $1,550 $16,677
260,582
kWh
$2,610
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,657 $2,122 - $15,657
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,668 $3 $10,668
166,686
kWh
- - -
TOTAL RECOMMENDED $174,061 $49,757 $27,345
427,268
kWh
$18,267
-
kW-mo/yr
$73,069
-
Tgal
$55,380
TOTAL IMPLEMENTED $45,612 $3,675 $27,345
427,268
kWh
$18,267
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs