ITAC Assessment: MI0025
ITAC logo
ITAC Assessment: MI0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Commercial food serving equipment
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 76,272
ft2
Annual Production 0
units
Production Hrs. Annual 2,244
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,101 1,298,445
kWh
Electricity Demand $36,824 4,535
kW-mo/yr
LPG $7,682 1,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $202,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.4311: Recover mechanical energy $165,750 $15,000 - - - $165,750
02 3.1181: Eliminate a by-product $35,000 $100 - - $35,000 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $492 $2 $492
7,347
kWh
- - -
04 3.1191: Change procedures / equipment / operating conditions $1,050 $100 $1,050
15,668
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $694 $1,778 $421
6,283
kWh
$273
-
kW-mo/yr
- -
TOTAL RECOMMENDED $202,986 $16,980 $1,963
29,298
kWh
$273
-
kW-mo/yr
$35,000 $165,750
TOTAL IMPLEMENTED $1,744 $1,878 $1,471
21,951
kWh
$273
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs